NEWS

 

 

  • SOWiL Limited develops own NSV system - CIMMS .
  • SOWiL Limited develops TraccAssure to validate data captured by Automatic Traffic Count and Classification systems .
  • SOWiL Limited has develops Traffic Information System for traffic analysis.
  • SOWiL Limited has develops APpave management system

 

  • Consultancy services for Preparation of Feasibility study and Detailed Project Report for the work of Selected/Corridors of road network in the state of Maharashtra for upgradation to Two lane with Paved shoulder/ Four lane configuration for the work of Dahegaon - Kamptee- Gumthala-Bhugaon- Kuhi- Umred road (Length 80km). Client National Highway Division, Nagpur.
  • Consultancy services for preparation of Feasibility study and DPR for construction of ROB on various level crossings in Vidarbha - Package IV Client- MSRDC
  • Consultancy services for preparation of Feasibility study & Detailed Project Report of Access Controlled Nagpur Mumbai Super Communication Expressway :2 Lane-15.69 and 6 Lane-77.976 Client –MSRDC
  • Feasibility study and Preparation of Detailed Project Report for 4/2 lane road with paved shoulders of following sections of National Highways in the State of Maharashtra Package 01: Stretch starting from Allapali to Bhamragarh- Laheri -Narayanpur Road Length- 104.00 km Client - National Highway Division Gadchiroli
  • Consultancy Services for Project Management Phase I including preparation of Detailed Project Report for upgradation of the road stretch (NH Declaration Approved “In Principle”)-Godda-Sunderpahari-Pakur section in the State of Jharkhand to two/four lane with paved shoulder configuration (LOT-III) (Total Length -87km) Contract Package No. NH/IAHE/33. Client- IAHE
  • Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh. (i) Stretch from Bareilly (junction at NH-30 near Civil Lines)- Bhutah - Bisalpur. = 36 km. (ii) Stretch from Moradabad- UP/Uttrakhand border - Jaspur – Kashipur (Total = 58 km, UP = 53 km, Uttarakhand = 5 km.) = 53 km. (iii) Akbarpur - Baskhari =23 km. Client - Regional OfficerMinistry of Road Transport & HighwaysVikas Nagar, Ring Road Biotech chowk Lucknow
  • Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-VI. (i) Chapwa – Betwa – Chatauni – Kushinagar Road – NH-28B – Km.60.23 (ii) Ghazipur – Jamaniya – Saiyad Raja Road – NH-97 – Km.56.20 Client - Regional Officer Ministry of Road Transport & Highways Vikas Nagar, Ring Road Biotech chowk Lucknow, U.P.
  • Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. HP/Shimla/4- Mandawala on NH–105 junction with Haryana –Barotiwalla – Patta – Kuthar – Arki – Shallaghat.Length-80 Km Client - Superintending Engineer NH Circle, HPPWD. Shimla
  • Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. HP/Shimla/6 - Shimla (Dhalli) – Tattapani –Churag –Rohanda -Sunder Nagar. Length-280 Km Client - Superintending Engineer NH Circle, HPPWD. Shimla
  • Traffic Survey On National Highways Using Portable Automatic Traffic Counter & Classifier (ATCC) Systems. Zone-5 in Odisha, West Bengal and North Eastern States.
  • Project Management Assistance (PMA) for the project of “Four Laning of Solapur to Yedeshi Section of NH-211 from Km 0.000 to Km 100.000 (Design Length-98.717Km) in the State of Maharashtra to be executed as BOT (Toll) on DBFOT pattern under NHDP phase IV.” 
 

Services

  Project Identification
  Pre-feasibility and Feasibility Studies
  Inventorisation
  Project Appraisal
  Project Planning and Preparation
  Traffic Surveys
  Topographical Survey
 

About Us

SOWiL Limited an ISO 9001:2015, formerly known as Sir Owen Williams innovestment Limited, was incorporated in India, in September 1996 with its Corporate Office in Mumbai. The Company's Head office and principal design office as well as APEC and APpave office is at Navi Mumbai; North office including business development, talent acquisition, TraccAssure, CIMMS and TIS as well as highway design and environmental studies at Noida.
 

Get In Touch

Swiss watchmaker Omega offer a modern version of the legendary Replica Watches Uk,This material is also being used in the Replica Watches Speedmaster HB-SIA Co-Axial GMT Chronograph dial coaxial, for Cheap Replica Watches it is unprecedented.Which is a major feature of the Fausse Montres, but it can be when an independent school.Case back center decorated with interesting patterns HB-SIA aircraft, marked some important information surrounding the Replique Montres, such as water depth (100 m / 330 ft).